CERT Team Equipment Supply (Company Emergency Response Team) - scdf cert Tier 1 P&FM Premises
- Product Code: CERT Tier 1 P&FM Premises
- Product SKU:
- Availability: In Stock
Cert Equipment singapore
Cert Team PPE
CERT PPE Equipment
Call us now for CERT audit equipment compliance.
T: (+65) 6266-0788 | E: nis4@noah.com.sg
- 5 sets of
firefighting suits;
- 5 sets of
firefighting helmets;
- 5 pairs
of goggles or 5 face shields;
- 5 pairs
of firefighting gloves;
- 5 pairs of firefighting boots;
NATIONAL CERT STANDARD
|
|
CLASSIFICATION OF CERT PREMISES |
MINIMUM TRAINING |
MINIMUM
EQUIPPING |
BASIC
TASKING |
||||
|
PPE1 |
MITIGATION |
FIRST AID |
COMMUNICATION |
|||||
|
P&FM Premises |
Tier 1 P&FM |
Premises storing more than
5 metric tons of Petroleum & Flammable Material |
WSQ Respond to Fire &
Hazmat Emergency (3 days)
CERT First Aider Couse (1
day) |
·
Chemical suits2 ·
Rubber gloves2 ·
Rubber boots2 ·
Firefighting suit ·
Firefighting helmet ·
Goggles / Face
shields ·
Firefighting gloves ·
Firefighting boots ·
Breathing apparatus |
·
HazMat absorbents2 ·
Leak sealing devices2 ·
Overpack drums2 ·
Fire extinguishers (appropriate class) ·
Firefighting nozzles
& hoses |
·
First aid kit ·
Foldable stretcher ·
Casualty Blanket (Optional) ·
AED |
·
Loud hailer ·
Walkie-talkie1 |
·
Contain HazMat leaks2 ·
Prevent spread of HazMat2 & fires ·
Activate HazMat2 & fire protection systems ·
Contain and mitigate incipient stages of HazMat2 & fire
incidents ·
Perform first aid, CPR & use AED ·
Implement In-Place Protection ·
Conduct mass evacuation ·
Assist emergency
responders |
|
Fire Safety Manager Premises |
Tier 1 HRI |
Public & Industrial
premises with FSM and classified as High Risk Installations by SCDF |
| |||||


